Florida is the nation's lightning strike capital, posing another challenge for our engineers. Such strikes can cause significant damage to computers and other electronic equipment. To counter this threat, the plant-wide network was constructed of fiber optic cable, which offers a very poor path for voltage surges from lightning strikes. In addition, each run of cable had a mirror run to provide redundancy, allowing re-initiation of service in the event of cable damage.

Value Added

One aspect of Revere's production is extensive testing using sophisticated real-world simulation processes. During this simulation testing phase, Palm Beach County personnel were at our plant receiving training on their exact system, which enhances their skills and promotes better operational performance. The system completed its testing as scheduled with no major issues identified.

Our engineering personnel were on site in Palm Beach for 12 months, coordinating the retrofit procedures and the installation of new equipment. Throughout the installation process, existing plant operations were maintained without interruption.

Palm Beach County residents probably won't spend much time thinking about their water reclamation plant. But the plant's owners and operators will be constantly reassured by the reliable system that allows them to run the plant effectively and efficiently.

 

(above) Fiber optic network cables (terminated at right of cabinet) help to minimize damage from lightning strikes. (below) Required redundancy is evidenced by this cabinet of twin PLCs.

     