Major Building Products Firm Increases Capacity and Yield

Objective:    The project included recommissioning and modernizing controls for (2) 300’ long production lines that had been idle for several years. It was necessary to upgrade the 1200 I/O PLC controls from a TI 555 platform to ControlLogix on each line. In addition, the system would require safety enhancements and new servo motion control to…

Details

Large Scale DLC Modernization in 8 Weeks

Objective:    A large 40-year-old mid-Western foundry was experiencing significant downtime and prolonged mean time to repair control system elements due to obsolescence and uncoordinated HMI strategy.  They invited Revere to participate in a lean event using Revere subject matter expertise to advise on production risks related to automation.  A major production risk was identified and…

Details

An International Silicon Metals Producer Upgrades Controls for Mix System #5

Objective:    To modernize, a large silicon metals producer upgraded their Mix System #5 control platform to include Rockwell ControlLogix controllers, Factory Talk platform-based visualization, recipe and batching systems, data acquisition and reporting. In addition, modern, efficient, VFD-based electromagnetic raw materials feeders were needed to replace existing outdated feeders.   Description of Services Provided: Designed, manufactured,…

Details

Professional Services Agreement for a City’s SCADA Control System

Objective: Professional Services Agreement for the configuration, maintenance, repair and replacements, diagnostics, administration, programming, upgrades, documentation and training for a City’s SCADA Control System   Description of Services Provided: Provided SCADA Services for various facilities: Water Treatment Plants Wastewater Treatment Plants Raw Water Wells ASR Wells Injection Wells Concentrate Wells Utility Lift Stations Re-Pump Stations…

Details

Revere Provides Continuing Services & Projects for Wastewater Treatment Plant, Collection & Water Distribution Systems

Objective: Southern City Contracts Revere on Ongoing Basis to Provide Continuing Services & Projects for Its Wastewater Treatment Plant, Collection & Water Distribution Systems   Description of Services Provided: Designed and installed control panels, utilizing GE 90-30 PLC hardware and MDS 900 MHz Radios Nine (9) WWTP PLC Control Panels Thirty-Three (33) Lift Stations RTU…

Details

Provided services for multiple water and wastewater treatment plants in Florida county

Objective: Revere was contracted to provide Field Instrumentation, PLC Control Panels, PLC/HMI Programming, Factory/Field Testing, and Startup and Commissioning Services for several Water and Wastewater Treatment Plants in county   Description of Services Provided: Added Field Instrumentation Level Transmitters/Transducers, Float Switches Venturi Flow Tubes Pressure Instruments – Gauges, Switches, Transmitters Designed and installed Motorola ACE3600…

Details

Instrumentation & Control Design from the 60% Design Level to the 100% Design Level

Objective: A General Contractor contacted Revere to complete the Instrumentation & Control Design from the 60% design level to the 100% design level for its Wastewater Treatment Plant   Description of Services Provided: Provided Equipment Listing and Data Sheets Division 17 Specifications I/O Listing Network Topology Managed Vendor Packages and Electrical/Mechanical Disciplines Installed Field Instrumentation…

Details

Wastewater Pump Station Radio/RTU Communication System Conversion

Objective: This municipal department contracted Revere to convert its existing Wastewater Pump Station Radio/RTU communication system to a cellular based system.   Description of Services Provided: Constructed and replaced 285 RTU/Radio assemblies by removing the existing RTU and radio hardware and replacing with new Motorola ACE3600 units and cellular based modems. Programmed PLC/RTU Programming (Motorola…

Details

Water Treatment Facility Control System Upgrade for North Carolina Town

Objective: This town contracted with Revere for a Water Treatment Facility Control System Upgrade project.  This included designing and installing PLC Control Panels, PLC/HMI Programming, Factory/Field Testing, Electrical Installation Services, Panel Modifications, Startup and Commissioning Services, and owner training.   Description of Services Provided: Designed and installed new PLC Control Panels using the Allen Bradley…

Details

Process Control Equipment and System Update for Water Treatment Plant in Florida Municipality

Objective: A General Contractor contracted Revere to be its Process Instrumentation Control System (PICS) Supplier.  This included designing, producing and testing their control panels and selection of field instrument devices.   Description of Services Provided: Coordinated with various process equipment manufacturers and suppliers to implement the project and design the process control system, which include…

Details