Objective:
A General Contractor contacted Revere to complete the Instrumentation & Control Design from the 60% design level to the 100% design level for its Wastewater Treatment Plant
Description of Services Provided:
- Provided
- Equipment Listing and Data Sheets
- Division 17 Specifications
- I/O Listing
- Network Topology
- Managed Vendor Packages and Electrical/Mechanical Disciplines
- Installed Field Instrumentation
- Provided PLC Control Panel Hardware and Drawings
- Installed computer hardware/software
- Designed software (Control Strategies and Graphic Displays)
- Managed Control System test plan
- Developed and implemented training plan
- Provided spare parts and tools
- Furnished operations & maintenance manuals
- Programmed PLC
- Configured HMI
- Conducted FAT testing
- Performed
- Detailed I/O checkout
- PLC Control Panels testing
- Field instruments calibration
- Establish communications & verification of functional control strategies
- Coordinated with equipment suppliers