Design-Build in the Control System Environment

Design-build is a project delivery system that can shorten project schedules by up to 30%. It is a comprehensive process that includes planning, design, and construction needed to execute a particular project. In the traditional usage, it may incorporate architecture, engineering, and contracting disciplines. In the industrial automation and controls environment (our world), design-build is more narrowly described…

Details

Legacy Control System Migration Part II

legacy-II-600 In Part I of our series, we discussed the definition of legacy controls migration and the reasons it has become a critical issue in many plants. This segment will address other issues related to implementing such a migration strategy. Developing a Migration Plan: Complete vs. Partial Although an immediate full migration would be the most effective remedy…

Details

How Ethernet Improves Communications

Fiber optical Throughout most of the history of personal computers, serial ports have been the most basic way to transfer data. Serial communication is a standard, accessible way to communicate with a large variety of devices including modems, mice, and most importantly (from a control engineer’s viewpoint) programmable logic controllers (PLCs). During this period, and extending into…

Details

Stuxnet and You: The Importance of Cyber Security

45383368_secureflatscreenCR The Stuxnet computer worm was discovered in 2010. It targets Siemens PLCs (Programmable Logic Controllers) through Siemens Step7 software. Through a rootkit, Stuxnet can control VFDs (Variable Frequency Drives) attached to the PLC. Allegedly, it damaged or destroyed many Iranian centrifuges. More information about the Stuxnet infection process can be found at http://www.symantec.com/connect/blogs/exploring-stuxnet-s-plc-infection-process. Although it is not the first…

Details

How the Water-Energy Nexus Affects Your Plant

The water-energy nexus continues to draw interest from our readers and attention in the media. This month, WaterWorld magazine gave it the importance of a cover story position. Why does it deserve such prominence, and what does it mean to your and your treatment plant? In simple language, the water-energy nexus represents recognition of the interdependence between…

Details

Smart Water Workshop

We are partnering with the Schneider Electric Water-Wastewater Competency Center to provide a one-day workshop entitled “Smart Water for Smart Cities” on Thursday, November 13, 2014, from 8:30 am to 3:30 pm. The workshop will address issues such as clean power, efficient energy usage, and safety within the water/wastewater treatment environment. The event will be hosted…

Details